3D dynamic line
Construct a three-dimensional dynamic line based on coordinate points.

<!DOCTYPE html>
<html>
<head>
<meta charset="utf-8"/>
<title>Build 3D dynamic lines</title>
<meta name="viewport" content="initial-scale=1,maximum-scale=1,user-scalable=no"/>
<style>
body {
margin: 0;
padding: 0;
}
#map {
position: absolute;
top: 0;
bottom: 0;
width: 100%;
}
</style>
<script src="https://delivery.mapmost.com/cdn/sdk/lite/v9.1.0/mapmost-lite-min.js"></script>
<script src="../../dist/js/Fun.js"></script>
<script src="../example_data/flowLine_data.js"></script>
</head>
<body>
<div id="map"></div>
<script>
let map = new mapmost.Map({
container: 'map',
style: "<your style url>",
center: [120.71832572622088, 31.317901031136927],
zoom: 15.7,
pitch: 60,
bearing: 0,
userId: '***', // Authorization code,This parameter must be added
});
map.on('load', function () {
let models_obj = ["../example_data/sz_buildings.glb"].map(item => ({
type: 'glb',
url: item
}));
let options = {
id: 'model_id',
type: 'model',
models: models_obj,
sky: "../example_data/hdr/WhiteBG_Ref_1K.hdr",
exposure: 0.7,
project: "3857",
center: [120.71755968678801, 31.32662823446909, 0],
callback: function (group, layer) {
let line_Circle = layer.addFlowLine({
type: "Circle",
repeatX: 100,//Number of repeats along the pipe path direction, default10
repeatY: 1,//Number of repetitions around the pipe direction, default is1
radius: 0.4,//Pipe radius, default is1
// closed:true,
speed: 2,
image: "../example_data/pic/wall.png",
opacity: 0.8,
data: {
name: "name1",
coordinate: [[120.71620510490567, 31.31511250302556, 0], [120.71826177206594, 31.315319923394995, 0.0]]
}
});
let line_Rectangle = layer.addFlowLine({
type: "Rectangle",
color: "#ffff00",
steps: 10,
rectangle: [0.2, 1],
repeatX: 20,//Number of repeats along the pipe path direction, default10
repeatY: 1,//Number of repetitions around the pipe direction, default is1
speed: 1,
image: "../example_data/pic/wall.png",
side: "DoubleSide",
data: {
name: "name2",
coordinate: [[120.71621788554057, 31.31466673893327, 0.0], [120.71838916982404, 31.314822371221595, 0.0]]
}
})
//Generate Bezier curve test data
let data_trail1 = getBSRPoints(120.71541557869517, 31.316503949907542, 120.73787560336916, 31.321925190347713, 800);
let data_trail2 = getBSRPoints(120.71541557869517, 31.316503949907542, 120.72619950480242, 31.33360076088249, 1500);
let data_trail3 = getBSRPoints(120.71541557869517, 31.316503949907542, 120.69933418653403, 31.332725809914024, 900);
[data_trail1, data_trail2, data_trail3].map(data => {
layer.addFlowLine({
type: "trail",
color: '#1ffff8',
speed: 4,
opacity: 0.6,
width: 5,
data: {
coordinate: data
}
});
})
flow_data.map(data => {
layer.addFlowLine({
type: "flow",
color: '#ff680d',
speed: 2,
opacity: 1,
percent: 0.08,
gradient: 0.02,
width: 5,
data: {
coordinate: data
}
});
})
let line_image = layer.addFlowLine({
type: "image",
// color: '#7aff39',
speed: 1,
opacity: 0.8,
width: 20,
repeat: {x: 5, y: 1},
image: "../example_data/images/colors3.png",
data: {
name: "name5",
coordinate: [[120.71609291062896, 31.31422725457385, 0.0], [120.71846865231805, 31.314327425303077, 0.0]]
}
});
}
};
map.addLayer(options);
})
</script>
</body>
</html>